On-site placement and securing of reinforcement
Steel fixing is where preparation becomes structure. Once your bars are cut and bent, they must be correctly assembled, positioned, and tied in place before the pour. Our team works directly on-site to fix reinforcement to the right spacing, cover, and alignment — following structural drawings and ensuring everything is secure and inspectable before concrete is placed.
What's included
- Assembly and tying of reinforcement cages
- Correct bar spacing and cover maintenance
- Placement in foundations, columns, beams, and slabs
- Checking alignment before concrete is poured
Why it matters
- Misplaced steel cannot be corrected after pouring
- Correct cover protects steel from corrosion
- Proper spacing ensures concrete fully encases bars
- Compliant fixing supports structural certification
Suitable for: all cast-in-place reinforced concrete work